A government spokesman revealed the schedule for “Prime Minister Settha” to prepare to inspect Phuket province on April 19 to follow up on projects to solve traffic problems. Ready to follow up on the performance of the police in many matters on April 17, 2024, Mr. Chai Watcharong, spokesman for the Prime Minister’s Office, revealed that Mr. Settha Thavisin, Prime Minister and Minister of Finance There is a government inspection scheduled for Phuket Province. On Friday, April 19, 2024, to follow up on the project to solve traffic problems. Construction project for the elevated bridge on Highway No. 4027 (city bypass). Project for construction of the new Sarasin bridge. and the interchange project at the intersection of Highway No. 402 and Highway No. 4027, along with monitoring the performance of police in the area. To solve various problems for this area visit, there will be Mr. Suriya Jungrungruangkit. Minister of Transport Mr. Chayatham Promsorn, Permanent Secretary of the Ministry of Transport, Mr. Chatuporn Buruspat, Permanent Secretary of the Ministry of Natural Resources and Environment, Mr. Chatchai Promlert, Chairman of the Board of Directors of PTT Public Company Limited, Mr. Phongsaran Asawachaisophon, Deputy Secretary-General of the Prime Minister political department Police General Kittirat Panphet, Deputy Commissioner of the Royal Thai Police Acting for the government Commissioner of the Royal Thai Police Join the government inspection team which is scheduled as follows at approximately 9:00 a.m., the Prime Minister and his delegation Departure from Military Airport 2, Wing 6 (Bon. 6), Don Mueang, Bangkok to Phuket International Airport. Then at approximately 10:30 a.m., the Prime Minister chaired a follow-up meeting and listened to a briefing on the project to solve traffic problems in Phuket Province at the meeting room at the airport. Consisting of 1. Highway No. 4027 (city bypass) (new road and elevated bridge connecting the airport) 2. Highway No. 4027 (city bypass) (the original route when the bottleneck was expanded to 4 traffic lanes) 3. Interchange project Intersection of Highway No. 402 and Highway No. 4027 (city bypass)4. New Sarasin Bridge Project After that, the Prime Minister will listen to a summary report on the elevated bridge construction project. Highway No. 4027 (bypass) Ban Mueang Mai section – intersection to enter the airport. Between km. 18+850 – km. 20+800 at the elevated bridge construction project area, Thalang District, Phuket Province. After completion of this point The Prime Minister will listen to the summary report of the new Sarasin Bridge construction project at the new Sarasin Bridge construction project area, Thalang District, Phuket Province, while in the afternoon. The Prime Minister will follow up on the performance of the police in the area at the Chaichinda Building. Provincial Police Region 8 Headquarters, Mai Khao Subdistrict, Thalang District, Phuket Province, consisting of 1. Solving the drug problem 2. Solving the problem of debt outside the system – Debt Market 3. Solving the problem of gambling dens online gambling and foreign mafias 4. Stricting restrictions on liquor stores that are similar to service establishments 5. Stricting the problem of rubber and illegal immigration along the border6. Solving the problem of housing for police officers thereafter The Prime Minister will go to the project area of the interchange project at the intersection of Highway No. 402 and Highway No. 4027 (bypass) (Thar Ruea Intersection), around the Thao Thep Kasattri and Thao Sri Sunthon Monument, Si Sunthon Subdistrict, Thalang District, Phuket Province, to listen. Summary report of the interchange project at the intersection of Highway No. 402 and Highway No. 4027 (City Bypass) (Thar Ruea Intersection) before traveling to the Koh Kaew intersection closure point. and the turning point in front of Thai Watsadu on Highway 402 to try and solve the current traffic problem. After completing the mission The Prime Minister and his team Will return to Route 6, Don Mueang, Bangkok at approximately 4:40 p.m., with the schedule subject to change as appropriate.
“Prime Minister Nid” will inspect Phuket on 19 April to follow up on police work and traffic problem solving projects.
Related posts